Roads and Access – Layout Comes First
20 to 22 percent of the site typically goes to streets and right-of-way
ROW width: 50 to 60 feet is common in residential areas
Cul-de-sacs: 40 foot radius to curb is standard
Plan for snow storage, driveway spacing, and emergency vehicle access
"Your street layout affects everything. It sets the structure for lot count, drainage, and grading."
Water and Sewer – Start with Availability
Water
8 inch mains are standard for fire protection
Hydrant spacing is typically 300 to 400 feet
Looping improves both flow and reliability
Sanitary Sewer
8 inch gravity mains at 0.4 to 0.8 percent slope
Manholes every 300 to 400 feet
Lift stations are uncommon, but should be identified early if needed
"Water and sewer are not always at your doorstep. Confirm location and capacity before you finalize a layout."
Stormwater – Capture, Treat, and Control
10 to 15 percent of the site is often needed for stormwater systems
Cities require both rate and volume control
Most sites also require water quality treatment
Underground systems are common on tight or high-value lots
"Stormwater design is about more than runoff. In the Twin Cities, water quality is part of every approval."
Grading and Earthwork – Align Early with Utilities
Maintain at least 2 percent slope away from buildings
Avoid slopes steeper than 3 to 1 unless reinforced
Balance cut and fill to manage cost
Match grading with sewer depth to avoid deep excavation
"Grading is where civil design becomes real cost. When done right, it supports every system across the site."
Dry Utilities – Route Smart and Coordinate Early
Trench depth: 24 to 36 inches
Easement width: 10 to 15 feet, usually on one side of the street
Joint trenching is common for electric, gas, fiber, and telecom
Avoid utility conflicts with storm sewer and tree preservation
"Coordinating utilities early avoids schedule delays and redesigns during construction."
Sidewalks, Mailboxes, and Open Space – Details that Matter
Sidewalks: 5 feet wide, usually set back 2 feet from curb
ADA ramps required at all crossings and intersections
Cluster mailboxes required for all new residential development
Many cities require trail links or park dedication based on lot count
"These items may seem minor, but they often drive both public perception and planning commission feedback."
How the Land Really Breaks Down
Use | Rule of Thumb |
Roads and Right-of-Way | 20 to 25 percent |
Stormwater Management | 10 to 15 percent |
Park Dedication or Open Space | 5 to 8 percent |
Buildable Lots | 55 to 65 percent |
"Ten acres does not mean ten acres of homes. A well-planned site balances density with functionality and compliance."