In the Twin Cities, every site comes with opportunities and limitations. Zoning, stormwater management, utility connections, and sidewalk requirements vary from city to city. Getting it wrong early can cost time, money, and momentum.


Whether you're planning a new subdivision or preparing an infill site, here’s a breakdown of what to expect, with rules of thumb and insights we use with clients across the metro.



Roads and Access – Layout Comes First


  • 20 to 22 percent of the site typically goes to streets and right-of-way

  • ROW width: 50 to 60 feet is common in residential areas

  • Cul-de-sacs: 40 foot radius to curb is standard

  • Plan for snow storage, driveway spacing, and emergency vehicle access


"Your street layout affects everything. It sets the structure for lot count, drainage, and grading."




Water and Sewer – Start with Availability


Water

  • 8 inch mains are standard for fire protection

  • Hydrant spacing is typically 300 to 400 feet

  • Looping improves both flow and reliability


Sanitary Sewer

  • 8 inch gravity mains at 0.4 to 0.8 percent slope

  • Manholes every 300 to 400 feet

  • Lift stations are uncommon, but should be identified early if needed


"Water and sewer are not always at your doorstep. Confirm location and capacity before you finalize a layout."



Stormwater – Capture, Treat, and Control


  • 10 to 15 percent of the site is often needed for stormwater systems

  • Cities require both rate and volume control

  • Most sites also require water quality treatment

  • Underground systems are common on tight or high-value lots


"Stormwater design is about more than runoff. In the Twin Cities, water quality is part of every approval."



Grading and Earthwork – Align Early with Utilities


  • Maintain at least 2 percent slope away from buildings

  • Avoid slopes steeper than 3 to 1 unless reinforced

  • Balance cut and fill to manage cost

  • Match grading with sewer depth to avoid deep excavation


"Grading is where civil design becomes real cost. When done right, it supports every system across the site."



Dry Utilities – Route Smart and Coordinate Early


  • Trench depth: 24 to 36 inches

  • Easement width: 10 to 15 feet, usually on one side of the street

  • Joint trenching is common for electric, gas, fiber, and telecom

  • Avoid utility conflicts with storm sewer and tree preservation


"Coordinating utilities early avoids schedule delays and redesigns during construction."



Sidewalks, Mailboxes, and Open Space – Details that Matter


  • Sidewalks: 5 feet wide, usually set back 2 feet from curb

  • ADA ramps required at all crossings and intersections

  • Cluster mailboxes required for all new residential development

  • Many cities require trail links or park dedication based on lot count


"These items may seem minor, but they often drive both public perception and planning commission feedback."



How the Land Really Breaks Down

Use

Rule of Thumb

Roads and Right-of-Way

20 to 25 percent

Stormwater Management

10 to 15 percent

Park Dedication or Open Space

5 to 8 percent

Buildable Lots

55 to 65 percent



"Ten acres does not mean ten acres of homes. A well-planned site balances density with functionality and compliance."




Working in the Twin Cities? Let’s Plan It Right From the Start


At Land Pro Civil, we help landowners, developers, and builders navigate the infrastructure, entitlement, and engineering process throughout the Twin Cities metro. Whether you're building five homes or fifty, we can help you move faster and avoid costly surprises.






 
 
 

Comments


The Land Pro Civil logo represents a trusted expert in construction, civil engineering, and land development across Minnesota and Colorado, building sustainable infrastructure solutions.

Boulder, Colorado

Minneapolis, Minnesota

© 2025 Land Pro Civil

bottom of page