Projects across Minnesota & Colorado.
Residential subdivisions, commercial retail, industrial campuses, and mountain-terrain developments. A sample of recent work, with case studies on the projects we can talk about publicly.
Protein Design Labs Industrial Campus
200,000 SF biologic pharmaceutical manufacturing facility on a 29-acre site, with grading, stormwater, and security coordination.
Chevalle Residential Community
Large residential community built around existing wetlands and a natural lakefront. Multi-pond stormwater and full utility design.
Elk Ridge Center
100,000 SF grocery-anchored retail center along Highway 169. Full site design with phased outlot infrastructure.
The Boulders Subdivision
Cost-conscious civil engineering in steep mountain terrain. Reduced road widths, eliminated a detention pond, redesigned the water system.
1229 Francis Street Townhomes
Alley-loaded townhome infill on a constrained urban Longmont parcel. Grading, stormwater, utility, and erosion control.
Early Childhood Education Facility
Tight urban Boulder lot with integrated grading, three-phase erosion control, utility design, and a creative parking strategy.
Mountain Residence Driveway, Tabernash
Grade-conscious driveway alignment, fire department coordination, and minimal-impact retaining walls in steep Grand County terrain.
Stonebridge Farms, Phase 1A
Full civil utility design for a large residential subdivision in Minot, ND. Phased rollout aligned with city master planning.
Kadampa Meditation Center
Urban infill water utility planning and Denver Water coordination for a meditation center on a constrained Denver lot.
Target Store, Buffalo MN
Full civil site design for a new Target store. Site layout, grading, stormwater, and city coordination through final approvals.
Hidden Creek Residential Subdivision
Large residential subdivision on former agricultural land. Streets, grading, drainage, utilities, and stormwater ponds for phased buildout.
Boulevard Market Retail Redevelopment
Site reconfiguration, stormwater upgrades, utility modernization, and ADA improvements with construction phasing that kept tenants open.
Take 5 Oil Change, Arvada
National-rollout Take 5 Oil Change on a small infill parcel along a high-visibility Arvada commercial corridor. Quick-turn permitting.
Tell us about your site.
Whether your project looks like one of these or something completely different, we'll come back with a clear proposal and a fee in writing.