PE Licensed MN · CO · ND · UT
Land Pro Civil
Service Area · Woodbury, Minnesota

Civil Engineering in Woodbury, Minnesota.

We work with developers, architects, and landowners on civil engineering for Woodbury land development, from CityPlace and Tamarack mixed-use to greenfield residential subdivisions in the southeast growth area and medical/office along Radio Drive.

Direct PE Access
Paul Wallick, PE.

Licensed Professional Engineer in Minnesota. The engineer designing your Woodbury project is the same engineer answering your call.

(303) 229-0180 →
Watershed Districts

The watershed districts that govern Woodbury stormwater.

Woodbury sits across two watershed-district boundaries. Each district sets its own stormwater rules, and most projects need a watershed-district permit on top of city review.

South Washington Watershed District (SWWD)

Covers most of the city, including the southern and central portions and the active southeast growth area. Most Woodbury projects fall under SWWD rules.

Valley Branch Watershed District (VBWD)

Covers the northern portion of the city, roughly north of Valley Creek Road. Different rule package than SWWD, so confirming the boundary matters.

Agencies & Permitting

Who reviews a Woodbury project.

A typical Woodbury land development project moves through city, county, state, and watershed review. We coordinate the full stack.

City of Woodbury Engineering and Public Works

Plan review for utilities, right-of-way, surface drainage, tree preservation, and city stormwater requirements. Woodbury runs its own SWPPP review.

Washington County Public Works

Access, turn lane, and frontage permits along CSAH routes including Radio Drive, Woodbury Drive, Valley Creek Road, and Bailey Road.

MnDOT Metro District

Access and frontage permits on I-94 and I-494. Common requirement for retail, office, and multifamily projects near interchanges.

Minnesota Pollution Control Agency (MPCA)

Construction Stormwater General Permit, plus PFAS-related coordination for any infiltration BMPs in impacted portions of the city.

Met Council Environmental Services

Sanitary sewer review. Trunk extension south and east is the active planning constraint for southeast Woodbury greenfield projects.

Local Considerations

What's different about engineering in Woodbury.

A few things shape how a project actually moves in Woodbury. We design with these baked in from day one.

  • East-metro PFAS plume. Historical 3M disposal sites left a plume under a meaningful portion of Woodbury. Stormwater infiltration is sometimes restricted or requires MPCA coordination. We confirm impacted-area status before sizing infiltration BMPs.
  • Southeast comprehensive plan growth staging. The city's greenfield growth area releases land in phases as Met Council and city trunk utilities extend south and east. Project timing depends on both schedules.
  • CityPlace and Tamarack Village PUDs. Mixed-use planned development with structured parking, shared stormwater, and Radio Drive frontage standards. Site design works against the PUD framework.
  • Lake shoreland overlays. Colby, Powers, Markgrafs, and other lakes trigger setbacks, impervious-surface limits, and DNR coordination on lake-adjacent sites.
  • Tree preservation ordinance. Woodbury requires inventory and caliper-inch replacement of significant trees. Wooded sites need that math in the civil budget early.
Project Types

What we work on in Woodbury.

Greenfield residential subdivisions on the east and south sides

Phased Met Council sewer staging, SWWD stormwater rules, Washington County frontage, and tree preservation.

CityPlace and Tamarack mixed-use redevelopment

Structured parking, shared stormwater, Radio Drive frontage standards, and MnDOT coordination at I-94.

Medical and office along Radio Drive

Compact site coverage, county turn-lane permits, and integrated stormwater BMPs at urban scale.

Multifamily and senior housing near Bailey Road

Dense site coverage, PFAS-aware stormwater design, and compact BMP layouts that meet SWWD volume control.

Frequently Asked

Common questions about civil engineering in Woodbury.

Does the east-metro PFAS plume affect my Woodbury site?+

Possibly. A meaningful portion of Woodbury sits over the east-metro PFAS plume from historical 3M disposal sites. That can restrict stormwater infiltration BMPs or require MPCA coordination, and the city is operating a long-term municipal water treatment build-out funded by the 3M settlement. Confirming whether a site sits inside the impacted area is one of the first calls on any Woodbury project.

Which watershed district covers Woodbury?+

South Washington Watershed District (SWWD) covers most of the city. Valley Branch Watershed District (VBWD) covers the northern portion roughly north of Valley Creek Road. Each has its own rule package and permitting process that runs parallel to city review.

Do you work on CityPlace and Tamarack redevelopment projects?+

Yes. CityPlace, Tamarack Village, and the broader Radio Drive corridor are mixed-use planned development zones with structured parking expectations, shared stormwater facilities, and Washington County frontage coordination. We design with those constraints baked in.

How does sanitary sewer staging affect southeast Woodbury growth?+

Met Council trunk sewer extension south and east is a real planning constraint, not a formality. The city's southeast comprehensive plan growth-staging area releases land in phases as utilities become available. Project timing depends on both city and Met Council schedules.

Do you coordinate Washington County and MnDOT permits for Woodbury projects?+

Yes. Washington County permits cover CSAH routes including Radio Drive, Woodbury Drive, Valley Creek Road, and Bailey Road. MnDOT permits are required for I-94 and I-494 access work. We prepare and submit both as part of the civil package.

Working on a Woodbury project?

Tell us about the site. You'll get a same-business-day response from Paul, with a real read on the civil scope, watershed jurisdiction, and likely permitting path.