PE Licensed MN · CO · ND · UT
Land Pro Civil
Service Area · St. George, Utah

Civil Engineering in St. George, Utah.

St. George is desert hydrology, and it does not behave like the Wasatch Front. Flash runoff arrives fast, the washes do the conveying, and the drainage rules are written around both.

Direct PE Access
Paul Wallick, PE.

Licensed Professional Engineer in Utah. The engineer designing your St. George project is the same engineer answering your call.

(612) 567-2154 →
Stormwater & Desert Drainage

How stormwater is regulated in St. George.

The city publishes its own Drainage Manual, and the most useful thing in it is counterintuitive: next to a major wash, detaining your runoff can be the wrong answer.

City Drainage Manual

Development is designed to the City Drainage Manual and the Standard Specifications for Design and Construction, which carry the design criteria and the operation and maintenance requirements for each stormwater practice.

Wash-adjacent sites

Projects near major washes or rivers generally carry no storage requirement, because local runoff reaches the channel ahead of the main stream flood hydrograph. Holding it back would release it into the peak instead of before it.

Long-term management

The Long-Term Stormwater Management program requires permanent stormwater controls on applicable new development and redevelopment, intended to manage runoff over the life of the project and protect the drainage infrastructure.

Agencies & Permitting

Who reviews a St. George project.

City engineering carries the review, with county, state, and federal floodplain layers depending on where the site sits.

St. George Engineering

Drainage and stormwater review against the City Drainage Manual and the Standard Specifications, plus grading, storm drain and utility design and right-of-way permits.

St. George Community Development

Site plan, zoning, and subdivision review, including hillside and sensitive lands provisions on the sloped ground around the city.

Floodplain administration

All work in a FEMA designated and mapped floodplain requires the appropriate permit, applied under the local ordinance. On a wash-crossed parcel this is often the first question worth answering.

Washington County

Zoning and subdivision review outside city jurisdiction and county road access.

Utah DWQ

Construction stormwater coverage under UTRC00000 or the Common Plan Permit, filed through NeT CGP. St. George falls under the small MS4 general permit UTR090000 rather than the Salt Lake County structure.

UDOT

Access and drainage permits on I-15, SR-18, and the state highway system.

Local Considerations

What is different about engineering in St. George.

Everything about desert drainage runs against Midwest instincts. Storms are short and violent, the ground does not absorb, and the timing of the peak matters more than the volume.

  • Next to a wash, storage can be the wrong answer. Projects near major washes or rivers generally have no storage requirement, because site runoff precedes the main stream flood hydrograph. Detaining it would hold your water back and release it into the channel's peak rather than ahead of it. That is the opposite of the instinct an engineer brings from a humid climate.
  • Basins still have to empty in 24 hours. Where detention is required, it is designed to empty within 24 hours. Anything holding water longer than that is extended detention and is treated as a different practice with different requirements.
  • The washes are the drainage system. Conveyance here runs through natural channels rather than a pipe grid. Where a wash crosses a parcel it sets the layout, the crossings, the easements, and the floodplain question all at once, and it is the first thing to map.
  • FEMA floodplain work needs a permit. All work in and around designated and mapped floodplains requires the appropriate permit under the local ordinance. On a site anywhere near the Virgin River or a mapped wash, floodplain status belongs in due diligence.
  • Maintenance becomes the owner's recorded obligation. On private property the landowner and their successors conduct periodic inspections and maintain all stormwater facilities, including inlets, pipes, channels, and detention basins. Annual inspection reports have to be filed and retained for three years. That is an ongoing obligation to put in the HOA budget and the closing package.
  • Growth is outpacing the old assumptions. St. George has been among the fastest growing areas in the country, and development has pushed onto ground where drainage patterns were never engineered. Upstream conditions on a parcel are worth verifying rather than inherited from an older study.
Project Types

What we work on in St. George.

Residential subdivisions

Plat layout around washes and mapped floodplain, grading, and drainage designed to the City Drainage Manual.

Commercial and retail

Site layout, parking, access, and the storage question answered correctly for the parcel rather than assumed.

Wash-adjacent and floodplain parcels

Floodplain permitting, crossings, easements, and conveyance where a natural channel runs through the site.

Hillside and sloped sites

Cut and fill, slope stability, and erosion control on the sloped ground around the city, where a short intense storm does the damage.

Frequently Asked

Common questions about civil engineering in St. George.

Does my St. George project need a detention basin?+

Not necessarily. Projects near major washes or rivers generally carry no storage requirement, because local runoff reaches the channel ahead of the main stream flood hydrograph, so holding it back would release it into the peak instead of before it. Whether that applies depends on the parcel, and it is worth establishing before designing a basin you may not need.

How long can a detention basin hold water?+

Detention facilities are designed to empty within 24 hours. A pond that takes longer than that is extended detention, which is treated as a different practice with its own design criteria and maintenance requirements in the city standards.

What happens if a wash crosses my site?+

It becomes the organizing constraint. Natural channels do the conveying here rather than a pipe network, so the wash sets the layout, the crossing locations, the easements, and the floodplain question together. All work in and around FEMA designated and mapped floodplains requires the appropriate permit under the local ordinance, so floodplain status is a due diligence item.

Who maintains the stormwater facilities after construction?+

The landowner and their successors. On private property the owner conducts periodic inspections and maintains all stormwater facilities, including inlets, pipes, channels, detention basins, and other structures controlling stormwater quantity and quality. Annual inspection reports have to be filed and retained for three years, so it belongs in the HOA budget and the closing package rather than surfacing later.

Is a design from northern Utah going to work here?+

Usually not without rework. St. George is desert hydrology with short intense storms, low infiltration, and conveyance through natural washes. The Wasatch Front cities design around sustained storms, snowmelt, and a piped network, and the storage logic is close to inverted next to a major wash. Plans get re-run against the City Drainage Manual rather than adapted.

Are you licensed in Utah?+

Yes. Paul Wallick is a licensed Professional Engineer in Utah, along with Minnesota, Colorado, and North Dakota. Drawings submitted in Utah have to be sealed by an engineer licensed in the state.

Working on a St. George project?

Tell us about the site. You will get a same-business-day response from Paul, with a real read on the civil scope, the regulatory path, and the likely permitting timeline.