Civil Engineering for Land Development in North Dakota.

We work with developers, architects, and landowners on civil engineering across North Dakota, from growth-edge subdivisions in the Red River valley to commercial sites in Bismarck and energy-corridor work out west. Paul is a licensed North Dakota PE.

Direct PE Access
Paul Wallick, PE.

Licensed Professional Engineer in North Dakota, Minnesota, Colorado, and Utah. The engineer designing your project is the same engineer answering your call.

(612) 567-2154 →
Stormwater & Permitting

How stormwater is regulated in North Dakota.

North Dakota runs two layers. The state permit sets the floor for every construction site. On top of that, ten cities hold their own MS4 permits and write their own design standards, and those standards are where projects actually get held up.

NDDEQ construction permit

The North Dakota Department of Environmental Quality issues the construction stormwater general permit NDR11-0000. One acre of disturbance triggers it, including sites that are part of a larger common plan. The SWPPP comes first, then the Notice of Intent through CERIS-ND at least seven days before construction.

City MS4 programs

Bismarck, Dickinson, Fargo, Grand Forks, Jamestown, Lincoln, Mandan, Minot, West Fargo, and Williston are all regulated MS4 communities under NDDEQ permit NDR04-0000. Each writes its own release rates, water quality requirements, and plan review process.

County and NDDOT

Burleigh, Cass, Grand Forks, and Morton counties hold MS4 permits of their own. NDDOT is a permittee too, and drainage structures on the state system follow NDDOT standard specifications. Access permits come through NDDOT on state highways.

Agencies & Review

Who reviews a North Dakota project.

A land development project in North Dakota moves through city, county, state, and sometimes federal review. We coordinate the full stack and prepare the submittals.

City engineering

Stormwater management plan review, grading, utilities, and right-of-way. In most North Dakota cities, stormwater approval is tied to the plat, so the engineering track and the platting track run together rather than one after the other.

City planning and zoning

Plat, zoning, conditional use, and land development code review. Preliminary plat, final plat, and the commission hearings that go with them.

NDDEQ

Construction stormwater coverage under NDR11-0000, Notice of Intent through CERIS-ND, and SWPPP review on request. Also the permitting authority behind every city MS4 program in the state.

NDDOT

Access, approach, and drainage permits on interstates and the state highway system. Drainage structure design follows current NDDOT standard specifications.

County

Zoning and subdivision review outside city limits, plus county road access. Several counties administer their own MS4 programs and some cities review projects in an extraterritorial jurisdiction beyond the city line.

US Army Corps of Engineers

Section 404 review where a project touches waters of the US, and coordination on the federal flood risk projects running through Fargo, Grand Forks, and Minot.

Local Conditions

What is different about engineering in North Dakota.

Northern plains sites do not behave like sites further south, and the codes reflect it. These are the things that decide a layout here.

  • Snowmelt is a design event, not a footnote. Minot regulates the 100-year, 10-day snowmelt event alongside the 24-hour rainfall storms. Spring melt on frozen ground produces runoff that a rainfall-only model never sees, and an engineer who has not worked in the north routinely misses it.
  • Very flat ground and very little fall. Across the Red River valley there is almost no natural grade. Getting positive drainage across a site without deep cuts is the central design problem, and it drives finished floor elevations, pond depth, and where an outlet can physically go.
  • Release rates are set, not negotiated. Fargo caps new development at 1 cfs per acre and holds redevelopment to its existing rate. Dickinson and Williston require post-development flow at or below predevelopment. The pond gets sized around that number, so it belongs in the first sketch of the site plan.
  • Flood risk projects are still being built. The FM Area Diversion, the Mouse River Enhanced Flood Protection Project in Minot, and the Grand Forks flood protection system all change what the mapped floodplain means on a given parcel. Where a site sits relative to that work matters to the design and to the financing.
  • Frost depth drives the utility design. Burial depths, service connections, and pond outlet details all get set by frost. It is one of the clearest places where a set of drawings produced somewhere warmer has to be redone.
  • A North Dakota PE seal is required. Plans submitted to a North Dakota jurisdiction have to be sealed by an engineer licensed in North Dakota. Williston puts it directly in the ordinance: the stormwater management plan has to be prepared by a licensed professional engineer.
Frequently Asked

Common questions about civil engineering in North Dakota.

Are you licensed to practice in North Dakota?+

Yes. Paul Wallick is a licensed Professional Engineer in North Dakota, along with Minnesota, Colorado, and Utah. Plans submitted to a North Dakota city or county have to carry the seal of an engineer licensed in the state, and the engineer who seals your drawings is the engineer you talk to.

When do I need a state stormwater permit in North Dakota?+

When the project disturbs one acre or more, or is part of a common plan of development that totals one acre or more. That triggers the NDDEQ construction stormwater general permit NDR11-0000. The SWPPP is prepared before you apply, and the Notice of Intent goes through CERIS-ND at least seven days before construction starts. NDDEQ can ask for the SWPPP at any point.

Which North Dakota cities have their own stormwater standards?+

Ten cities hold MS4 permits under NDDEQ permit NDR04-0000: Bismarck, Dickinson, Fargo, Grand Forks, Jamestown, Lincoln, Mandan, Minot, West Fargo, and Williston. Burleigh, Cass, Grand Forks, and Morton counties hold them too, along with NDDOT. Each sets its own release rates and review process, so the same site plan does not clear every city.

Do you travel to North Dakota sites for construction observation?+

Yes, and it is worth scoping up front. Construction phase work is priced by what the project actually needs rather than by a standing site visit count, so tell us the construction schedule early and we will put a real number on it instead of a placeholder.

How do your fees compare to the large regional firms?+

Meaningfully lower, for the same senior engineer. There is no project manager layer, no junior engineer learning on your project, and no big-firm overhead in the rate. You get a fixed fee for a defined scope rather than an open hourly meter.

Can you work outside city limits?+

Yes. County zoning and subdivision review applies outside the cities, and several cities also review projects in an extraterritorial jurisdiction that extends past the city line. Grand Forks is one of them. Tell us the parcel and we will confirm who actually has review authority before any design starts.