PE Licensed MN · CO · ND · UT
Land Pro Civil
Service Area · West Fargo, North Dakota

Civil Engineering in West Fargo, North Dakota.

West Fargo is one of the fastest growing cities in North Dakota, which means most of the civil work here is new ground: subdivisions, commercial pads, and the utility and drainage backbone that has to go in ahead of them.

Direct PE Access
Paul Wallick, PE.

Licensed Professional Engineer in North Dakota. The engineer designing your West Fargo project is the same engineer answering your call.

(612) 567-2154 →
Stormwater & City Standards

How stormwater is regulated in West Fargo.

West Fargo holds its own MS4 permit and publishes separate stormwater standards depending on what you are building, so the requirements for a commercial pad are not the requirements for a two-family lot.

City of West Fargo MS4

West Fargo is a regulated MS4 community under NDDEQ permit NDR04-0000. The city maintains separate stormwater management standards for commercial sites, for single and two-family residential, and for utility contractors working in the right-of-way.

NDDEQ construction permit

Any site disturbing one acre or more, or forming part of a common plan of development of one acre or more, needs coverage under the state construction stormwater general permit NDR11-0000. The SWPPP is written first, then the Notice of Intent goes through CERIS-ND at least seven days before construction starts.

Sediment control is enforced

West Fargo enforces a tracked-sediment ordinance. Mud carried into the street can be ticketed, large chunks have to come off immediately, and finer sediment has to be cleaned up by the end of the day. Erosion control on a West Fargo site is an operational commitment, not a line on a plan sheet.

Agencies & Permitting

Who reviews a West Fargo project.

West Fargo projects run through city review, county review where the site sits outside city jurisdiction, and the state permits on top.

City of West Fargo Engineering

Stormwater management plan review, grading, storm sewer and utility design, and right-of-way permits. Erosion and sediment control review, including the tracked-sediment requirements, sits here too.

West Fargo Planning and Zoning

Plat, zoning, and land development review. Preliminary and final plat move through the commission on the usual schedule, and stormwater approval runs alongside it.

Cass County

Zoning and subdivision review outside city jurisdiction and county road access. Cass County holds its own MS4 permit.

NDDOT

Access and drainage permits on I-94, Main Avenue, and the state highway system. Drainage structures follow current NDDOT standard specifications.

NDDEQ

Construction stormwater coverage under NDR11-0000, Notice of Intent through CERIS-ND, and SWPPP review on request.

Southeast Cass Water Resource District

Drainage and water management coordination in the Sheyenne River corridor and on the legal drain system that runs through much of the area.

Local Considerations

What is different about engineering in West Fargo.

West Fargo is growing fast on very flat ground next to a river that floods. That combination sets most of the design decisions.

  • The Sheyenne River corridor runs through the city. Floodplain, floodway, and the diversion works around the Sheyenne all affect what can be platted and at what elevation. Where a parcel sits relative to that system is worth confirming before a layout is drawn, not after.
  • Tracked sediment is actually ticketed. The city enforces mud carried out of a site onto public streets, with immediate removal for large material and same-day cleanup for the rest. That means rock construction entrances, wheel wash, and street sweeping belong in the contractor's budget from the start.
  • The standards depend on what you are building. Commercial, single and two-family residential, and utility work in the right-of-way each follow their own set of city standards. Applying the wrong one is a straightforward way to get a submittal kicked back.
  • Legal drains cross a lot of the growth area. Much of the developable ground drains through the assessment drain system rather than to a natural channel. Outlet rights, easements, and water resource district coordination come with that, and they show up early in a plat.
  • Flat ground, high water table. As in the rest of the valley, there is almost no natural fall. Pond depth, finished floor elevations, and utility burial all get worked backwards from the water table and the available outlet.
Project Types

What we work on in West Fargo.

Residential subdivisions

Growth-edge single family and townhome plats. Grading, drainage, detention, and the utility backbone, coordinated with the plat schedule.

Commercial and mixed-use pads

Site layout, parking, access, grading, and stormwater treatment against the city's commercial standards.

Industrial and light manufacturing

Large impervious areas, heavy truck circulation, and detention sized for the site rather than borrowed from a neighboring plat.

Utility and right-of-way work

Water, sanitary sewer, and storm sewer design and coordination, including the city's separate standards for contractors working in the right-of-way.

Frequently Asked

Common questions about civil engineering in West Fargo.

Does West Fargo have its own stormwater standards?+

Yes. West Fargo is a regulated MS4 community under NDDEQ permit NDR04-0000 and publishes its own stormwater management standards. They are split by project type, with separate requirements for commercial sites, for single and two-family residential, and for utility contractors. The right set has to be identified before design starts.

What is the mud ordinance?+

West Fargo enforces sediment tracked from construction sites onto public streets. Large chunks of mud have to be removed immediately and finer sediment has to be cleaned up by the end of the day, and sites can be ticketed. Practically, it means stabilized construction entrances and a street sweeping plan belong in the contractor's scope, not just on the erosion control sheet.

How does the Sheyenne River affect my site?+

It depends where the parcel sits. Mapped floodplain and floodway limits affect buildable area and minimum elevations, and drainage in much of the area runs through the legal drain system rather than to a natural channel. We confirm outlet rights and floodplain status before laying anything out.

Do I need a state permit as well as city approval?+

Yes, if the site disturbs one acre or more or is part of a common plan of development of one acre or more. That triggers the NDDEQ construction stormwater general permit NDR11-0000, with the SWPPP prepared first and the Notice of Intent filed through CERIS-ND at least seven days before construction starts.

Are you licensed in North Dakota?+

Yes. Paul Wallick is a licensed Professional Engineer in North Dakota, along with Minnesota, Colorado, and Utah. Plans submitted to West Fargo have to be sealed by an engineer licensed in the state.

Working on a West Fargo project?

Tell us about the site. You will get a same-business-day response from Paul, with a real read on the civil scope, the regulatory path, and the likely permitting timeline.