Urban Residential Infill, Townhomes · Longmont, CO

1229 Francis Street Townhome Infill in Longmont, Colorado.

Civil engineering for an alley-loaded townhome infill on a small Longmont parcel, with grading, stormwater, utility design, and erosion control tuned to a constrained urban lot.

Project Type
Urban Residential Infill, Townhomes
Location
Longmont, Colorado
Client
Private Developer

The Challenge

This townhome project involved developing a small infill parcel within an established neighborhood in the City of Longmont. The site had limited frontage and required efficient use of space for building footprints, alley-loaded garages, and utility access.

The city's stringent stormwater, utility, and grading requirements added complexity to the design on a constrained urban lot.

Civil Engineering Contributions

Grading and Drainage Design

Developed a grading plan that provided positive drainage away from units while meeting city requirements for slope and accessibility. Drainage patterns were designed to work with the alley-loaded layout and adjacent properties.

Stormwater Compliance

Created a site-specific stormwater strategy to manage runoff and meet City of Longmont water quality standards. Integrated inlets and underdrains were coordinated with site grading to provide effective collection and treatment within the compact development footprint.

Utility Infrastructure Coordination

Designed domestic water, sanitary sewer, and storm drain systems to serve all units efficiently. Utility alignments were carefully planned to avoid conflicts within tight corridors and to coordinate with existing city infrastructure in the street and alley.

Erosion Control Plan

Prepared a complete erosion control plan for initial, interim, and final phases to protect downstream systems and meet city construction standards throughout development.

City Coordination and Submittals

Worked directly with the City of Longmont through the civil construction document process, incorporating review comments and achieving approval across multiple departments.

The Outcome

Approved Civil Plans

Full grading, utility, drainage, and erosion control plans were approved and ready for construction.

Optimized Infill Site Design

The civil layout allowed the townhomes and alley-loaded garages to fit seamlessly into the existing neighborhood.

Efficient and Compliant Infrastructure

All city requirements were met through smart design and clear coordination with project partners and reviewers.